Infrastructure along evacuation route with improved flood, erosion and landslide protection standard

Problem Area - Flood Vulnerability

Created at: 15 May 2022

Description

  1. Gabion structures in five previously high-risk locations along evacuation road to stabilize slopes against erosion and landslides

  2. Two culverts positioned at flood prone sections of road

  3. Three causeways built to spread out force of stream flows during rainy season and prevent road flooding, erosion and landslides

  4. 15m of concrete road over erosion prone stretch of road to allow community easy access along evacuation route