Technical Description:
Location: Barangay Talavera, Toledo City, Cebu Province Service Contract: Citicore Solar Toledo, 60 MW Solar Power Generation (for 25 Years) Grid: Visayas Transmission Line: c.420 m; 69 kV Installed Capacity: 60.0 MWdc Inverter: Schneider Electric 550 - 800V DC – 380V AC, 1040A, 72 Inverters COD: 30 June 2016 Design Life: 30 years EPC Contractor(s): MCC O&M Contractor(s): CPI Grid Connections: Connection point to the NGCP grid through the 69 kV Calulng-Calulng substation
PV Module Description:
No. of modules: 193,440 Manufacturer: BYD and Renesola Model: 310 Cell Type: Polycrystalline Silicon Peak Power Output: 310Wp Module Efficiency: 15.98/16.00% Power Tolerance: 0/+5Wp Temp Coefficient: -0.43% and -0.4%/°C
Each PV table is designed to have 2 rows of 20 PV modules each with 2.0 m row-to-row distance to enhance efficiency of the overall PV array Tier 1 rated and internally accredited and approved PV module suppliers were chosen based on bankability, warranty and availability of modules
Help us provide more detailed information about this project by contributing!
Ruben Matahelumual
• Submitted 821 projects
• Expert at Climate Events - Learning From Trouble
• Germany
Below you will find the latest related projects in this category.